toggenberg
sund 5
menu
entry

<=== That pinpoint of Light is a Mile Away!

collar

The concrete - lined part - Toggenberg is only just a fit when the water is low in the pound.

The Foulridge end of the tunnel was built by forming a deep cutting with timber shoring , then building the tunnel in stone before backfilling it all again. All done by pick and shovel, no steam power involved!

Vimeo

wheel

The passage would be impossible without these wheels to guide the boat - the rudder is not a lot of use

stone